EPC pilot project © Saparevabanya
saparevabanya-Logo

Project Stakeholder

Sapareva bania Municipality

Street lightening in Sapareva bania Municipality – Bulgaria

Facility and Initial Situation

Facility

  • Street lighting project with 1381 lamps in Sapareva bania Municipality in the region of Kustendil (Bulgaria)

Initial Situation

  • The street lights were in a bad condition (broken, lacking etc.) and thus consuming a lot of energy

Goals and Measures

Goals of building owner

  • Reduction of energy consumption and the CO2 emissions

Measures

  • Replacement of 1381 lamps by LED lights

Facts

Installation of energy efficiency measures

2015 -2016

Duration of the contract

7 years

Total Investment

226,584 €

Energy costs (Baseline)

133,336 €

Guaranteed savings in Euro

93,335,38 €/a

Guaranteed savings in %

70 %

Reduction of CO2 emissions

328 t/a

Innovations and Client’s Advantages

  • LED lights – high quality, low consumption

Picture: ©  Sapareva bania Municipality

Filter Categories