Facility and Initial Situation

Facility

  • Administrative building of the Central Office of Sofia agricultural academy (Bulgaria)
  • Old building with high energy consumption

Initial Situation

  • Annual consumption of electrical energy: 62,045 kWh
  • Annual energy consumption for heating: 280,919 kWh
  • Heat energy from gasoil (23,405 kWh) plus electrical energy for air conditioning (19,557 kWh)
  • Annual energy consumption for hot water: 4,002 kWh

Goals and Measures

Goals of building owner

  • Reduction of energy consumption and the CO2 emissions

Measures

  • Thermal insulation of external walls
  • Window replacement
  • Insulation of roof
  • Fuel switching – installing pellet boiler
  • Installation works: Roof repair

Facts

Installation of energy efficiency measures

2014 – 2016

Duration of the contract

5 years

Total Investment

222,269 €

Energy costs (Baseline)

41,241 €

Guaranteed savings in Euro

13,893,133 €/a

Guaranteed savings in %

28 %

Reduction of CO2 emissions

85,16 t/a